Services

LET'S GO!
AxCo Design provides you with immense added value through the use of tools. Our team has created user-friendly solutions with an unprecedented impact. You can create a high-quality 3D model with minimal costs or automate project management.

Services
AxCo Design provides you with immense added value through the use of tools. Our team has created user-friendly solutions with an unprecedented impact. You can create a high-quality 3D model with minimal costs or automate project management.
We do
By fusing developers talent with engineering expertise, we're able to integrate vision and execution so you can improve your results.

Development

Steel Detailing

By fusing developers talent with engineering expertise, we're able to integrate vision and execution so you can improve your results.
By fusing developers talent with engineering expertise, we're able to integrate vision and execution so you can improve your results.

Consulting

We do
Development
By fusing developers talent with engineering expertise, we're able to integrate vision and execution so you can improve your results.
By fusing developers talent with engineering expertise, we're able to integrate vision and execution so you can improve your results.
Steel Detailing
By fusing developers talent with engineering expertise, we're able to integrate vision and execution so you can improve your results.
Consulting
Our cases
Our cases
03
01/
LNG Construction Center. The production of natural gas liquefaction trains on gravity-based structures (GBS). Topsides yard № 107. Roof
The roof was designed of roof trusses installed along columns with a pitch of 12,0 m and along side trusses. The span of purlins is 6.0 and 6.5 m.
LNG Construction Center is located in the Belokamenka in the Murmansk Region - the main part of the LNG equipment manufacturing industry emerging in Russia.
Weight: 14,740,000 tons
Size: 280,0 x 335,5 m, 92,0 m high
Period: September 2019, February 2020
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
03
02/
LNG Construction Center. The production of natural gas liquefaction trains on gravity-based structures (GBS). Topsides yard № 107. Roof
The roof was designed of roof trusses installed along columns with a pitch of 12,0 m and along side trusses. The span of purlins is 6.0 and 6.5 m.
LNG Construction Center is located in the Belokamenka in the Murmansk Region - the main part of the LNG equipment manufacturing industry emerging in Russia.
Weight: 14,740,000 tons
Size: 280,0 x 335,5 m, 92,0 m high
Period: September 2019, February 2020
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
03
03/
The roof was designed of roof trusses installed along columns with a pitch of 12,0 m and along side trusses. The span of purlins is 6.0 and 6.5 m.
LNG Construction Center is located in the Belokamenka in the Murmansk Region - the main part of the LNG equipment manufacturing industry emerging in Russia.
Weight: 14,740,000 tons
Size: 280,0 x 335,5 m, 92,0 m high
Period: September 2019, February 2020
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
LNG Construction Center. The production of natural gas liquefaction trains on gravity-based structures (GBS). Topsides yard № 107. Roof
03
01/
LNG Construction Center. The production of natural gas liquefaction trains on gravity-based structures (GBS). Topsides Yard № 107. Facades and Gate
Facades are designed of columns and trusses. Trusses are rigid spatial structures of complex shapes. The guides of the sliding gable gates and the half-timbered system are fixed on the trusses.
Weight: 7,725,000 tons
Size of facade: 335,5 m width, 92,0 m high
Period: February 2020, August 2020
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Specification of Steel, Assembly Mark List, Bolt Summary List

03
02/
Facades are designed of columns and trusses. Trusses are rigid spatial structures of complex shapes. The guides of the sliding gable gates and the half-timbered system are fixed on the trusses.
Weight: 7,725,000 tons
Size of facade: 335,5 m width, 92,0 m high
Period: February 2020, August 2020
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
LNG Construction Center. The production of natural gas liquefaction trains on gravity-based structures (GBS). Topsides Yard № 107. Facades and Gate
03
03/
Facades are designed of columns and trusses. Trusses are rigid spatial structures of complex shapes. The guides of the sliding gable gates and the half-timbered system are fixed on the trusses.
Weight: 7,725,000 tons
Size of facade: 335,5 m width, 92,0 m high
Period: February 2020, August 2020
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
LNG Construction Center. The production of natural gas liquefaction trains on gravity-based structures (GBS). Topsides Yard № 107. Facades and Gate
LNG Construction Center. The production of natural gas liquefaction trains on gravity-based structures (GBS). Topsides Yard № 107. Facades and Gate
Facades are designed of columns and trusses. Trusses are rigid spatial structures of complex shapes. The guides of the sliding gable gates and the half-timbered system are fixed on the trusses.
Weight: 7,725,000 tons
Size of facade: 335,5 m width, 92,0 m high
Period: February 2020, August 2020
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
Automated with
02
01/
LNG Construction Center. The production of natural gas liquefaction trains on gravity-based structures (GBS). Topsides Yard № 107. Facades and Gate
Facades are designed of columns and trusses. Trusses are rigid spatial structures of complex shapes. The guides of the sliding gable gates and the half-timbered system are fixed on the trusses.
Weight: 7,725,000 tons
Size of facade: 335,5 m width, 92,0 m high
Period: February 2020, August 2020
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
Automated with
02
02/
02
01/
Platform for flare KO drum and 4 piperacks for LNG were modeled.
The Utrenneye field is the resource base for Arctic LNG 2. The field is located in the Gydan Peninsula in YNAO approximately 70 km across the Ob Bay from Yamal LNG.
Total Weight: 1,355,000 tons
Period: August 2019, February 2021
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Shop drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
Arctic LNG-2
Automated with
02
02/
Platform for flare KO drum and 4 piperacks for LNG were modeled.
The Utrenneye field is the resource base for Arctic LNG 2. The field is located in the Gydan Peninsula in YNAO approximately 70 km across the Ob Bay from Yamal LNG.
Total Weight: 1,355,000 tons
Period: August 2019, February 2021
Scope of work included:
Detailed 3D-model LOD 400 in Tekla Structures
Erection drawings
Shop drawings
Specification of Steel, Assembly Mark List, Bolt Summary List
Arctic LNG-2
Automated with
Let's start automating
Let's start automating
They already innovate with us
"Automation Movement is here and now. Our Technology and Automation League partners are domain experts who are passionate about enterprise automation and process excellence. Join the movement."
Markus Zirn
VP Business Development
They already innovate with us
"Automation Movement is here and now. Our Technology and Automation League partners are domain experts who are passionate about enterprise automation and process excellence. Join the movement."
Markus Zirn
VP Business Development
They already innovate with us
"Automation Movement is here and now. Our Technology and Automation League partners are domain experts who are passionate about enterprise automation and process excellence. Join the movement."
Markus Zirn
VP Business Development
They already innovate with us
Markus Zirn
VP Business Development
"Automation Movement is here and now. Our Technology and Automation League partners are domain experts who are passionate about enterprise automation and process excellence. Join the movement."
They already innovate with us
"Automation Movement is here and now. Our Technology and Automation League partners are domain experts who are passionate about enterprise automation and process excellence. Join the movement."
Markus Zirn
VP Business Development
They already innovate with us
"Automation Movement is here and now. Our Technology and Automation League partners are domain experts who are passionate about enterprise automation and process excellence. Join the movement."
Markus Zirn
VP Business Development
Made on
Tilda